Fits through doors
A three-part split for retrofit sites with narrow access.
Li-Br absorption chillers driven by gas, steam or hot water. Use waste heat instead of electricity for cooling.

Absorbent concentration control and power-failure recovery timer.
Open the water box cover only; piping stays connected.
A three-part split for retrofit sites with narrow access.
Real-time internal pressure and saved vacuum data for leak diagnosis.
| Direct fired (WCDH, WCDN) | 100 ~ 1,500 TR; up to 3,000 TR on request |
|---|---|
| Steam (WCSH) | 100 ~ 1,500 TR; up to 4,000 TR on request |
| Cycle | Lithium bromide absorbent, water refrigerant |